Module -1 :Planning Development
1.1A Input and Data
1.1.2 Contract Requirements
1.1.3 Identification of Stakeholders
1.1.4 Constructability Methods
1.2 Considerations and Constraints
1.2.1 Identification of Resources
1.2.2 Value Engineering
1.2.3 Stakeholder Considerations
1.2.4 Project Variables
1B. Planning Product
1.3 Planning Output and Deliverables
1.3.1 Define Scope of Work
1.3.2 Define Project Goals
1.3.3 Define Project Plan
1.3.4 Phase Definition
1.3.5 Establish Work Breakdown Structure (WBS)
1.3.6 Establish Organizational Breakdown Structure (OBS)
1.3.7 Cost Breakdown Structure (CBS)
1.3.8 Sequencing and Phase Relationships
1.3.9 Review by Stakeholders
1.3.10 Cost Estimate Development
1.3.11 Baseline Plan
1.3.12 Periodic Forecasts
1.3.13 Risk and Recovery Plan
Module 2 – SCHEDULING
2A. Schedule Development
2.1 Input and Data (from Planning)
2.1.1 Define Schedule Scope
2.1.2 Breakdown Structures (WBS/OBS/CBS)
2.1.3 Schedule Specification
2.1.4 Feedback from Stakeholders
2.1.5 Cost Estimate Model
2.2 Creating Schedule
2.2.1 Types of Schedules
2.2.2 Activities
2.2.3 Durations
2.2.4 Relationships
2.2.5 Constraints and Calendars
2.2.6 Cost/Resource Loading
2.2.7 Milestones
2.2.8 Schedule Quality Analysis and Compliance Review
2.2.9 Schedule Basis Documentation
2B. Schedule Maintenance/Controlling
2.3 Maintain Schedule
2.3.1 Baseline Schedule
2.3.2 Tracking Schedule Progress
2.3.3 Cost and Resource Management
2.3.4 Schedule Change Management
2.3.5 Acceleration
2.3.6 Schedule Maintenance Feedback
2.4 Schedule Output and Deliverables
2.4.1 Control Level Schedules
2.4.2 Variances and Trends
2.4.3 Schedule Analysis
2.4.4 Schedule Forecasts
2.4.5 Constructability Review
2.4.6 Progress Reports and Reviews
2.4.7 Recovery Schedules
2.4.8 Management Summary
Course Outline for Primavera
Contents
- Introduction to Primavera P6
- Designing and Configuring Primavera Solutions in P6
- Explain the framework of latest version of Primavera and preliminary setup like user/login creation, OBS, EPS etc.,
- Identify how to develop schedule, assign and level resources, Cost using Primavera
- Update the actual work complete, resource utilization and compare with the baseline to monitor deviation.
- Elucidate how to perform EVA using the tool and measure various project metrics like Cost and Schedule variances, indices and forecast the future with various assumptions.
- Describe risk evaluation and documentation using the tool
- Describe types of report and step by step procedure to generate the reports